Beaver Creek Phase 111, IV Developer
Update:
A note from Steve Brown 1/3:
Chapel Ridge neighbors: I
had hoped to hear something definitive by now from the town of
Apex on the
route of the extension of Beaver Creek Drive from its current dead
end to Kelly Road. As of today (Jan 3) the final route
selection is still up in the air, so I’ll pass along what I have
found out any way. The developer and the Town of Apex are
still exploring four alternate routes. See the attached figure
that shows them and their proximity to Chapel ridge. North is
to the left on the figure. I have also attached an aerial
photo of our neighborhood and the surrounding area that shows
significant streams and the current route of I-540. Also
included is a digital photo I took at Apex town hall of the overall
plan for the new shopping center. Dianne Kihn, the Apex
planner for this case, has told me that NCDOT is still reviewing the
traffic plan for the development and has not approved anything yet
that would let the developer proceed with a route selection.
If I hear anything new I’ll pass it along.
The following picture shows the
planned 540 path - Our Neighborhood is in the middle-right of this
picture.

The following picture is of the alternatives currently
being reviewed for the Beaver Creek Extension:

|